Color Steel Activities Room Maintenance Requirements Mar 29, 2017

1. color-coated steel housing activity after the installation is complete, users are not allowed to change the structure shall not remove any bolts component shall not increase or decrease the partition, such as the need to change should, in consultation with my factory approval to change, or else user.

2. light steel structure should be maintained 1-2 years of paint, to extend the product life and maintain appearance.

3. steel color steel activities room piece throughout the connection, user features electric lighting equipment, wires can not be directly binding on the steel, conduit or cable trench isolation installed should be established in order to avoid electric shock.